consultants
Engineering Consulting
Lean Production
System integration
RAISING POTENTIAL
The consulting services for raising potential and process optimization are an addition to our product range of deburring technology & high pressure technology - deburring tools & system components.
​
For efficient workpiece deburring and machining, as well as for
System and process implementation with focus
Lean Production.
In many cases there is insufficient potential in production.
- The system integration, with new efficient processes, enables the producer to use the released financial resources - cash flow - for new investments. -
​
​
Our track record represents in-depth and profound know-how from production, automation, robotics and machine tools, as well as in terms of Technologies: battery production, e-mobility, deburring, aqueous component cleaning, assembly and processing.
​
We offer you this scope of services with our partner:
​
​
​
​
​
​
​
Engineering Consulting
Process optimization - As a supplement to the products from ST-SturmTEC, to increase the technical availability and increase the efficiency of production machines, plants and systems, with a focus on Lean Production .
​
-
Design of tools and systems
-
Tool and system optimization
-
Process optimization
-
Workpiece endoscopy
​
Additional services are:
​​
-
OEE / GAE, K factor
-
TPM (Total Productive Maintenance)
-
Material flow cost accounting
-
Amortization calculation
-
Quality management
The following link takes you to the SturmConsultants / EngineeringConsulting webpage.
Workpiece analysis (endoscopy)
To analyze the deburring process or the deburring results, before and after deburring with HPWS technology, high pressure water jet technology or mechanical deburring, using high speed deburring (special deburring tool).
before
later
Endoscopy as an essential and fundamental analysis method for quality assurance measures in the automotive and supplier industry.
Advisory process
P1
Situation analysis
Is the basis for a successful optimization of existing processes, e.g. in the fields of e-mobility, power train and car body.
​
-
Environment analysis
-
Analysis of the upstream and downstream production processes
-
Sub-process analysis
-
Workpiece analysis
-
Workpiece endoscopy
P2
Concept development
After the generation of alternatives, these are concretized by means of a rough and detailed concept.
​​
-
Development of rough and detailed concept
-
Calculation, cost analysis
-
Amortization calculation
-
Attempts to process validation
-
Optimal choice of procedure
P3
Implementation planning
As the basis for the implementation phase.
With cost and time planning for efficient project implementation.
​​
-
Estimation of effort and cost calculation
-
Project management
-
Cost planning, time planning
-
Definition of the project team for implementation
P4
implementation
To ensure efficient project implementation. Moving in workpieces to stabilize the process and ensure workpiece quality.
​
-
Workpiece endoscopy
-
TARGET-ACTUAL comparison
-
Moving in workpieces
-
Quality management